Emergency healthcare architecture in Brazil
Contents |
[edit] Introduction
Expectations about which direction will be the best path to be adopted in the different architectural scenarios for health have created a special challenge in Brazil during the pandemic of 2020/2021.
[edit] Brazilian experiences
In the Brazilian health system, it was possible to identify the different buildings for health assistance (EAS) dedicated specifically to the treatment of people affected by COVID-19:
- Hospitals that care exclusively for the patient with the disease, including existing units converted to service and units built temporarily for assistance.
- Hospitals for general disease care including COVID-19.
In most hospitals, a crisis committee was set up with professionals from management, assistance and technical areas such as architecture and engineering. The main concerns were related to changes in external and internal flows, the creation of beds dedicated to COVID, the mapping and or the acquisition of new equipment and the identification of the need to provide changes the air conditioning systems.
The first adaptations were; the creation of external environments for screening potentially infected patients, the separation of flows between different patients and the separation of access by the assistance team. Then came the zoning of inpatient areas, which defined exclusive areas for infected patients. Another fundamental item was the organisation of the areas of laboratory and imaging exams.
[edit] The floating hospital
The Floating Hospital was developed to attend emergency situations in the North Region. The equipment was installed on a floating raft and transported by river to its destination.
The arrangements in the space can vary from a large inpatient unit with 60 intensive care beds (with adaptable criticality allowing for the patient's stage of recovery in the bed itself), to a 30-bed hospital of medium complexity with an operating/obstetric centre, basic imaging, and laboratory. This includes technical and logistical support sectors necessary for its operation.
The air conditioning system was designed in full compliance with technical standards of air quality and international safety.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.